The channel dredged was about 40km and TDC deployed several major dredgers, including Tong Xu, Tian Lin Hao and Tian Hua.
Tong Xu was dredging the outer channel
Tian Lin Hao was working on site
Copyright Reserved © 2013 CCCC Tianjin Dredging Co.,Ltd.