You are here:Home >> Activices >> Activities >> Dredging & Reclamation
The 300,000-ton waterway of Tianjin Port

Tianjin Port developed from a river port to a world-class man-made sea port with remarkable achievements being made. Of which, TDC undertook many major projects such as: curve cut-off of channel, port construction (phase III) , widening and deepening of the main channel, dual channel construction, construction of the 100,000-ton waterway and the 300,000-ton waterway etc.. Several large trailing suction hopper dredgers, Tong Tu, Tong Cheng, Tong Xu and Tong Li, dredged a golden waterway of 300,000-ton for oil tankers and bulk carriers, which realized a "four-lane" channel that large ships can go in the middle while small ones along both sides.

   Asia's largest trailing suction dredger Tong Tu was reclaiming soil for the 300,000-ton waterway project of

Tianjin Port

Several trailing suction hopper dredgers were working for the 150,000-ton waterway project

  Three large trailing suction hopper dredgers were working for the 250,000-ton waterway project of Tianjin Port