The 250,000-ton waterway of Yingkou Port

The 250,000-ton waterway of Yingkou Port was constructed all by trailing suction hopper dredgers. As the project featured short construction period, heavy workload, poor soil properties and should also take into account the access project (phase IV) meanwhile, TDC deployed several large trailing suction hopper dredgers and used advanced construction methods to ensure project quality and schedule .

Tong Cheng, the then “Asia’s foremost hopper dredger” was working for the 250,000-ton waterway project of Yingkou Port in 2010

Tong Cheng and Tong Xu were rainbowing for the 250,000-ton waterway project of Yingkou Port